Building Permits in ZIP 10003
Manhattan, NY — 1,069 permits filed recently
1,069 permits
Exterior facade repairs. metal cornice repair. stone patching
General construction and associated work for the 2nd floor, no change in use, egress or occupancy.
Structural work related to the replacement of one (1) new cooling tower and filtration system. no change to use, egress, or occupancy.
Interior renovation @ partial 3rd.,4th. ,5th. & 6th. floor (apts. #3a,4d,4f,4h,5h &6h) in an existing 6 storyw/ cellar building. no change in use ,egress or occupancy
Plumbing & sprinkler works in conjunction with restaurant tenant fitout renovation. no change to use, egress, or occupancy.
Interior renovation of a store to be a nail salon. no change in use, occupancy, or egress.
Installation of sidewalk shed as shown on drawings. no change in use egress or occupancy. we shall comply with chpater 33 of 2022 b.c
Renovation and combination of apts #10k & 10l, minor non structural partition work; removal of one kitchen and some bath plumbing work filed as a subsequent. no change in egress, use or occupancy
Mechanical work as per plans filed herewith. no change in use, egress and occupancy,
Heat Pump Installation; includes removal and replacement of existing condensers and air handlers. Installation of New Steel Dunnage at the Roof to accommodate new, smaller condensers. No change in use...
Modification to existing plumbing system in Apt. #15, as per plans filed herewith. No change in use, egress or occupancy.
Mechanical work as per plans filed herewith. no change in use, egress and occupancy,
Interior renovation of a store to be a nail salon. no change in use, occupancy, or egress.
Renovation and combination of apts #10k & 10l, minor non structural partition work; removal of one kitchen and some bath plumbing work filed as a subsequent. no change in egress, use or occupancy
Modification to existing plumbing system in Apt. #15, as per plans filed herewith. No change in use, egress or occupancy.
Installation of sidewalk shed as shown on drawings. no change in use egress or occupancy. we shall comply with chpater 33 of 2022 b.c
Interior renovation @ partial 3rd.,4th. ,5th. & 6th. floor (apts. #3a,4d,4f,4h,5h &6h) in an existing 6 storyw/ cellar building. no change in use ,egress or occupancy
Structural work for new stair opening at Basement level.
Combination of Apartments 11A and 11H. Interior renovation including removal of 1 laundry in apartment 11A and 1 kitchen in 11H. Minor partition changes.
Plumbing work filed for the installation of new water heater as per plans. No change in use egress or occupancy.