Building Permits in ZIP 10002
Manhattan, NY — 525 permits filed recently
525 permits
General construction for interior renovations of existing commercial space for softville as per plans filed herewith. no change in use, egress or occupancy.
(BARUCH HOUSES, BUILDING 3) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
Installation of temporary plywood fence as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Interior demolition of non structural partitions and interior renovation of existing apartment h-206 on 2nd floor no change in use egress or occupancy
Structural work in relation to the newly proposed 16 story mixed use building as per plans filed.
(BARUCH HOUSES, BUILDING 3) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
Installation of temporary plywood fence as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Proposed one story maintenance and operation pre-fabricated 968 sf new building in east river park.
(BARUCH HOUSES, BUILDING 2) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
FACADE REPAIRS (BARUCH HOUSES, BUILDING 4) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
Relocate existing bathroom (1 WC + 1 Lavatory) and kitchen sink in NYCHA Baruch house TA office.
(BARUCH HOUSES, BUILDING 2) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
FACADE REPAIRS (BARUCH HOUSES, BUILDING 4) Local Law 11/98 related facade and roof-bulkhead repair project. No change in use, egress or occupancy.
General Construction work to renovate and repair existing fire damaged residential apartments at 2nd floor and hallway at 1st floor indicated on drawings filed herewith. No change in Use Egress or Occ...
Relocate existing bathroom (1 WC + 1 Lavatory) and kitchen sink in NYCHA Baruch house TA office.
Proposed one story maintenance and operation pre-fabricated 968 sf new building in east river park.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Scope of work includes underground plumbing piping installations. no changes to the egress or zoning.
Interior plumbing work of existing apartment h-206 on 2nd floor no change in use egress or occupancy
Interior demolition of non structural partitions and interior renovation of existing apartment h-206 on 2nd floor no change in use egress or occupancy