Building Permits in ZIP 10002
Manhattan, NY — 525 permits filed recently
525 permits
Filing Plumbing work to for a new natural gas service to transition boiler plant from fuel oil to dual-fuel.
Filing herewith renovation of existing offices as per plans. no change in use, egress or occupancy.
Facade repairs
Two new boilers and two new hot water heaters with associated ducts and piping.
Install plumbing fixtures in first floor and cellar. No change to occupancy use or egress under this application
Fabrication of the 4th floor armature and 3rd floor support per plans filed herewith. No change to use, egress or occupancy.
Installation of temporary suspended scaffold equipment.
Nstall new fixtures in conjunction with new spa and outdoor kitchen for residential passive recreation roof terrace recreation. new outdoor gas grille, sink, gas cooktop, outdoor shower, spa and ventl...
1ST
File application to remedy ecb violation #35655980j, no change in use, egress, occupancy, and bulk
Plumbing work associated with renovation of existing commercial space for 'softville' as per plans filed herewith. no change in use, egress or occupancy.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
Nstall new fixtures in conjunction with new spa and outdoor kitchen for residential passive recreation roof terrace recreation. new outdoor gas grille, sink, gas cooktop, outdoor shower, spa and ventl...
Install plumbing fixtures in first floor and cellar. No change to occupancy use or egress under this application
Plumbing work associated with renovation of existing commercial space for 'softville' as per plans filed herewith. no change in use, egress or occupancy.
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
Installation of temporary suspended scaffold equipment.
1ST
Two new boilers and two new hot water heaters with associated ducts and piping.
Fabrication of the 4th floor armature and 3rd floor support per plans filed herewith. No change to use, egress or occupancy.