Manhattan, NY — 1,056 permits filed recently
1,056 permits
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy.
AT 35th floor tenant space and bathrooms, removal of plumbing lines and fixtures. At bathrooms, Installation of Plumbing Lines and fixtures as per plans filed herewith. No change to use, occupancy, or...
Hereby filing to construct interior partitions, ceilings and door for new tenant and elevator lobby as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications to existing sprinkler system / piping for new tenant on the 3rd floor. No change in use, egress or occupancy.
Hereby filing for interior demo of none bearing partitions, ceiling, floors, bathrooms,. all structural work to be filed under a separate application. no change in use egress of occupancy.
Industrial rope access for facade inspections.
AT 35th floor tenant space and bathrooms, removal of Sprinkler Heads and related piping. At bathrooms, installation of new sprinkler heads. At vacant tenant space, installation of temporary sprinkler...
Installation of 2 ton air conditioning unit on the 7th Floor. No change in use egress and occupancy.
Modifications to existing plumbing and sprinkler system. No change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications to existing sprinkler system / piping for new tenant on the 3rd floor. No change in use, egress or occupancy.
Industrial rope access for facade inspections.
plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Construction fence
Proposed interior renovation for a nail spa and installation of nail ventilation system and air conditioner system in unit#601,#603 on the sixth floor as per plan. no change in use, egress oroccupancy...
Hereby filing for interior demo of none bearing partitions, ceiling, floors, bathrooms,. all structural work to be filed under a separate application. no change in use egress of occupancy.