Building Permits in ZIP 10001
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Filing herewith for Standpipe modification to the existing system. No change to use, egress or occupancy.
Filing herewith Plumbing modifications, installation of plumbing fixtures, and associated piping as per plans. No change to use, egress or occupancy.
AT 27TH FLOOR PUBLIC BATHROOMS, Installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
Structural work as shown on plans
AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Existing Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occupancy, or egress.
#8964 - removal of non bearing partitions, flooring and fixtures. level existing floors. no change in use, egress or occupancy.
At 27th floor public bathrooms, installation of interior partitions & finishes as per plans filed herewith. no change in use, occupancy or egress.
Interior renovation of portions of 1st, 2nd, and 3rd floors per the 1968 building code. this includes the 2nd & 3rd floor reconfiguration of the northeast tenant space & elevator lobby.
Restrooms - Sprinkler work on the 7th floor as indicated on drawings.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 nyc building code . no change in use, occupancy, or egress under this ap...
Suspended Scaffold for Facade Restoration as Shown on Plans
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
plumbing modifications on floors 1 and roof as per plans filed herewith. no changes in use, egress or occupancy.
Filing sp for work related to interior alteration and fitout of 2nd floor of assembly restaurant
Restrooms - Sprinkler work on the 8th floor as indicted on drawings.
plumbing modifications on floors 1 and roof as per plans filed herewith. no changes in use, egress or occupancy.
Restrooms - Sprinkler work on the 7th floor as indicated on drawings.
Suspended Scaffold for Facade Restoration as Shown on Plans
Restrooms - Sprinkler work on the 8th floor as indicted on drawings.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.