Building Permits in ZIP 10001
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Temporary structures for an event. To be removed at the end of the programing. No changes to existing structures, use or egress or historical fabric. Associated TPA M01311194.
Modifications to the existing HVAC system on the 1st floor (Landlord Work) as per plans. No change to use, egress or occupancy.
Interior renovation to convert 4 existing housekeeping rooms into 4 new guest rooms. No change to gross floor area. Previous work filed under NB# 103504021.
Hereby filing to remove and construct interior partitions, ceilings and doors for tenant space as shown on plans filed herewith. No change to use, occupancy or egress.
AT 33RD FLOOR TENANT SPACE, installation of sprinkler piping and heads as per plans filed herewith. No change to use, occupancy, or egress.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Modification to existing Structural Systems as per plans filed herewith. No change in use, egress or occupancy.
Hereby filing to install mechanical equipment with associated ductwork and piping for tenant modifications as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing for plumbing scope in conjunction with renovaion of hotel rooms.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Modification to existing Structural Systems as per plans filed herewith. No change in use, egress or occupancy.
AT 33RD FLOOR TENANT SPACE, installation of sprinkler piping and heads as per plans filed herewith. No change to use, occupancy, or egress.
Sprinkler work on 1st floor as per plans filed herewith. No change in use, egress or occupancy.
Application filed for mechanical additions/modifications on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 8th floor (suite 802-804) as per plans filed herewith. no change in use,egress, or occupancy.
General construction including renovations to 2nd floor Market Hall and terrace, as shown on plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 8th floor (suite 802-804) as per plans filed herewith. no change in use,egress, or occupancy.