Building Permits in ZIP 10001
Manhattan, NY — 1,056 permits filed recently
1,056 permits
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (10M). No change in u...
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 5th floor (suite 503 & 504) as per plans filed herewith. no change in use, egress, or occupancy.
CleanSpace to install a temporary exhibit within an existing exhibition building. CleanSpace Booth #2235 on LVL 3 / Exhibit Hall 3B for Interphex 2026. Scheduled construction 04/17 - 04/24. No change...
Modifications to the existing plumbing system in basement (Le Cafe) as per plans. No change to use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th floor (suite 1103) as per plans filed herewith. no change in use, egress, or occupancy.
Sever connection between apts 1a and 1b on the first floor and recreation rooms on the cellar level. at the cellar level create bicycle storage, accessoory tenants laundry room and accessory gym for b...
Application filed for plumbing modifications/additions on the 11th floor (darrow) as per plans filed herewith. no change in use, egress, or occupancy.
Filing for Facade repairs as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 12th and 14th floors as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work on 1st floor as per plans filed herewith. No change in use, egress or occupancy
The new ductwork and piping work on the 29th floor
Office space renovation consisting of non-structural interior demolition and general construction as per plans filed herewith. no change to use, egress or occupancy under this application.
Plumbing work associated with installation of 2nd floor commercial cooking system.
Plumbing work on 1st floor as per plans filed herewith. No change in use, egress or occupancy
Filing for Facade repairs as per plans filed herewith. No change in use, egress, or occupancy.
Plumbing work associated with installation of 2nd floor commercial cooking system.
Application filed for plumbing modifications/additions on the 11th floor (darrow) as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Office space renovation consisting of non-structural interior demolition and general construction as per plans filed herewith. no change to use, egress or occupancy under this application.