Building Permits in ZIP 10001
Manhattan, NY — 1,048 permits filed recently
1,048 permits
Terrace work including windscreen and facade renovation work on an existing building as per plans filed herewith. no change in use, egress, or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Installation of horizontal netting as per plans. no change in use, occupancy, or egress under this application. horizontal netting shall comply with chapter #33 of 2022 the nyc building code.
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
Plumbing and Sprinkler work being filed on the 6th floor. No change to use, egress or occupancy.
Replacing and adding new plumbing fixtures with related plumbing piping for new restrooms, exam/office room, and new water fountain.
Existing sprinkler system to be modified with the addition of new (4) sprinkler heads with related piping work.
Removal of interior non load bearing partitions and finishes as per plans
This application has been filed for the installation of a Temporary Structure in accordance with BC 3103 for an event scheduled on March 25, 2026.There is no change in use, occupancy, or means of egre...
Subsequent application filed for sprinkler modifications/additions on the 7th fl (suite 706) as per plans filed herewith. no change in use, egress, or occupancy.
To install reception desk on 10th floor. this job is in conjunction with alt1# 121692828.
Installation of temporary fence as per plans. no change in use, egress or occupancy.
Replacing and adding new plumbing fixtures with related plumbing piping for new restrooms, exam/office room, and new water fountain.
Subsequent application filed for sprinkler modifications/additions on the 7th fl (suite 706) as per plans filed herewith. no change in use, egress, or occupancy.
This application has been filed for the installation of a Temporary Structure in accordance with BC 3103 for an event scheduled on March 25, 2026.There is no change in use, occupancy, or means of egre...
Removal of interior non load bearing partitions and finishes as per plans
Existing sprinkler system to be modified with the addition of new (4) sprinkler heads with related piping work.
Plumbing and Sprinkler work being filed on the 6th floor. No change to use, egress or occupancy.
Installation of temporary fence as per plans. no change in use, egress or occupancy.
Subsequent application filed for plumbing modifications/additions on the 7th fl (suite 706) as per plans filed herewith. no change in use, egress, or occupancy.