HVAC Permits in Queens, New York
395 hvac permits filed recently
395 permits
Mechanical ventilation for (1) bathroom (1) wet bar (1) boiler room (1) laundry room
Mechanical work for exhaust hood and hvac system in existing eating & drinking establishment on the first floor.
Cap/remove gas connection to eleven (11) gas boilers and replace with three boilers.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Subsequent filing for plumbing work. install bathroom, kitchen, and boiler room. no change in use, egress, or occupancy.
Replace eleven (11) gas/oil fired boilers with three (3) gas/oil fired boilers.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
installation of new steel access platforms for new boilers, entry platform and stairs from storage room to boiler room, new concrete pads for mech. equip., temporary shoring of ceiling in coal storage
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building