Demolition Permits in Queens, New York
85 demolition permits filed recently
85 permits
Fully demolition of existing 2 1/2 story house
Full demolition on existing 1-story detached garage in rear yard.
Fully demolition of existing one story house
General construction work consisting of inter demolition and construction as per the plans filed herewith. no change to use, egress or occupancy.
Interior demolition and general construction of interior non-load bearing walls associated with construction of bathrooms as per plans filed herewith. No change to occupancy, use or egress.
Fully demolition of existing one story garage
Replace left side existing siding in existing 2.5 story building.demolition work and construction work as per plan. no change in egress, use, or occupancy.
Filing herewith for the demolition to existing cellar and 1st floor as indicated per plans. There is no change to use, egress, or occupancy.
Renovation of a single-family dwelling renovation. Work includes non-structural demolition and general construction as per plans file herewith.
Full demolition of detached 2 story mixed use building to comply with NYC HPD Immediate Emergency Declaration, DEC# 19866
Exterior work will be limited to paint. tenant build out for a new fine/fast-casual restaurant with dine-in and take-away services including demolition and general construction work of interior walls...
An existing commercial store with interior renovation on partition and refurbishement work on the 1st floor . demolation work of concrete extension on the 1st floor to remove violation# 34336525n.no c...
Hand demolition of fully detached garage.
Interior demolition of non-load bearing walls, removal of all interior finishes and fixtures including, but not limited to the following; doors, door frames, trim, windows, cabinetry, and shelves as p...
demolition of a 2 family house
THIS IS A FULL DEMOLITION OF 1 STORY FRAME HOUSE. FENCE FILED UNDER SEPARATE APPLICATION. ENTIRE FOUNDATION BELOW GRAD IS TO REMAIN IN PLACE (as per 3303.13.3) AND ADDRESSED IN SOE PLANS OF HERE AFTER...
Proposed demolition of 1-1/2 garage.
Temporary construction fence for the full demolition of 207-04 garage 104 avenue
installation of construction fence to protect site during full demolition
installation of construction fence, to protect site during full demolition