HVAC Permits in Queens, New York
395 hvac permits filed recently
395 permits
Install new HVAC system for Bank of America.
RENOVATION OF EXISTING CELLAR AND 1st FLOOR WITH PLUMBING WORK: REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER, DRYER, BOILER AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE, EGRESS...
New vertical & horizontal enlargement to existing 2 1/2 story 1-family building. interior gut renovation at cellar, first, second and attic floor. new partitions, windows & finishes, hvac as per plans
Addition and alteration of one family house to install new plumbing fixtures and related piping as per floor plan.Existing gas fired hot water heater and boiler will be removed.Existing wall mounted s...
Installation of a new boiler
Install three (3) replacement chimneys for one (1) replacement gas-fired boiler and two (2) existing boilers as per plans. no change in use, egress or occupancy.
Addition and alteration of one family house to install new plumbing fixtures and related piping as per floor plan.Existing gas fired hot water heater and boiler will be removed.Existing wall mounted s...
Install three (3) replacement chimneys for one (1) replacement gas-fired boiler and two (2) existing boilers as per plans. no change in use, egress or occupancy.
RENOVATION OF EXISTING CELLAR AND 1st FLOOR WITH PLUMBING WORK: REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 2-PC RESTROOM, WASHER, DRYER, BOILER AND HOT WATER HEATER IN CELLAR; NO CHANGE IN USE, EGRESS...
Installation of a new boiler
Replacement boiler and gas burner
Installation of HVAC equipment and ductwork for auto showroom.
Install new plumbing fixtures at new roughing (1 hand sink, 2 comp-sink, 2 f.d.) at 1st floor and (1 hand sink, 2 f.d., 1 mop sink) at cellar floor. new gas equipment (2 deep fryers, 1 flat grill, 1 c...
Installation of a new boiler and a new burner to create a mobile boiler trailer unit # 100-04-24. no change in use, egress, or occupancy.
Install new plumbing fixtures at new roughing (1 hand sink, 2 comp-sink, 2 f.d.) at 1st floor and (1 hand sink, 2 f.d., 1 mop sink) at cellar floor. new gas equipment (2 deep fryers, 1 flat grill, 1 c...
Replacement boiler and gas burner
FILING FOR CROSS CONNECTING TWO BOILERS' DOMESTIC HOT WATER COILS FOR BUILDINGS 48-45 46th STREET AND 48-55 46th STREET.
Replacement boiler and burner.
Install boiler and h.w.h. for 3 family dwelling in cellar floor. plumbing work as per plan. no change in egress, use or occupancy.
Replace gas boilers.