Building Permits in Manhattan, New York
24,739 recent building permits filed in Manhattan. Updated daily from public records.
24,739 permits
Modifications to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
removal of fixtures as per plans
Removal of existing Kitchen service sinks; Relocation of water closet and lavatory; Installation of a new WC & lavatory, and bar station hand sink
Plumbing work filed in conjunction with triplex apt renovation. no change in use, occupancy, or egress.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Exterior upgrades in conjunction with renovation of 20-story nycha multiple dwelling. no change to use, egress or occupancy.
Propose the plumbing works as per plan in conjunction with arch. design. no change in use, egress, and occupancy.
Interior renovation as per plans filed herewith.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation of 5-story nycha multiple dwelling as part of the nycha pact renovation: interior renovation of kitchen and bathroom throughout, replace of casework, counters and cabinets; no chan...
Filing herewith for replacement of AC unit in Unit 11A
Modification to the existing sprinkler system on the 2nd floor (Elevator lobby & corridor) as per plans. No change to use, egress or occupancy.
Propose to install new illuminated channel letters on existing storefront for existing commercial space. no change to use, egress or occupancy.
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 12th, 24th and 25th floors as per plans. No change to use, egress or occupancy.
Installation, removal and relocation of sprinkler heads as per plans. No change to use, egress, or occupancy
Scope of work limited to repairs to facebrick, brick re-pointing, brick stitching, roofing repair, and roof railing repair, window lintel and sill repair
Replacement of brick masonry at north elevation for fisp cycle 9c compliance
Prodnycid39@hotmail.com
MANHATTAN currently has 2,760 total permits on file with 2,180 new permits filed in just the last 30 days. That's serious construction activity. Other work leads the category with 1,405 permits, followed by renovation (378 permits), plumbing (366 permits), commercial (141 permits), and pool work (129 permits). For contractors hunting leads, this volume means steady opportunity. The money is concentrated in specific zip codes. 10022 leads with 250 permits, followed by 10001 (160 permits), 10019 (146 permits), 10017 (127 permits), and 10011 (125 permits). If you work in mechanical, electrical, plumbing, or general contracting, these neighborhoods are where permit activity clusters. Knowing where the work is filed helps you target bids efficiently. The average permit value in MANHATTAN is $311,849. That tells you the job sizes you're competing on. Most permits fall into the other and renovation categories, meaning property owners are doing full overhauls. Plumbing work is steady at 366 permits, so if you're in that trade, there's consistent opportunity. Contractors who monitor new permit filings can bid on jobs before competitors even know they exist. Our database updates daily from public records. The faster you see new permits, the better your chances of getting in front of property owners and GCs early. MANHATTAN's permit data shifts constantly, and staying current means you don't miss opportunities.
Frequently Asked Questions
How do I find new construction leads in MANHATTAN?
Monitor new permit filings daily. MANHATTAN averages 2,180 new permits filed every 30 days, so there's constant activity. Set up alerts for your trade and the zip codes where you work. When a permit is filed, you have a narrow window before other contractors see it. Check permits filed for the past 7 days first, then work backward. Property owners and GCs typically start calling subs within days of permit approval, so speed matters. Focus on zip codes 10022, 10001, and 10019 where permit volume is highest.
What are the most common permit types in MANHATTAN?
Other work dominates with 1,405 permits, which covers miscellaneous construction. After that, renovation comes in at 378 permits, plumbing at 366 permits, commercial at 141 permits, and pool work at 129 permits. If you're a plumber or HVAC contractor, renovation and other work categories are your biggest opportunity. If you're a general contractor, focus on renovation permits where you're likely to pull together a full team. The numbers show MANHATTAN is more renovation-heavy than new construction.
Which zip codes in MANHATTAN have the most building permits?
10022 has 250 permits, making it the most active by far. 10001 follows with 160 permits, 10019 with 146 permits, 10017 with 127 permits, and 10011 with 125 permits. These five zip codes account for the bulk of MANHATTAN permit activity. If you're deciding where to focus your outreach and networking, start here. Contractors who know the neighborhoods where work is happening can build better relationships with local GCs and property managers.
What is the average building permit value in MANHATTAN?
The average permit value in MANHATTAN is $311,849. That's a solid mid-to-large project size. This means if you're bidding, you're typically competing on jobs with real budgets, not minor repairs. Knowing the average helps you price bids competitively and understand the caliber of work happening. Most jobs won't be simple handyman work; they'll be substantial renovation or construction that justifies bringing on experienced crews.
How often is MANHATTAN permit data updated?
Permit data is updated daily from public records. New permits are added to the system as they're filed with the city. This means you should check for new filings every day if you want to stay ahead of competition. A permit filed today may have five contractors calling by next week. The contractors who check the data first get first shot at estimating and pitching their services. Daily monitoring is how you build a consistent pipeline of bids.