Structural modifications taking place on the 38th and 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Removal of sprinkler heads; install temporary sprinkler loop on the 20th floor as indicated on drawings.
Install and register one ac for the 1st floor restaurant. no change in use, egress or occupancy.
16th floor tenant build out, air handler and coolant system and new kitchen exhaust system for existing eating & drinking establishment as per lno # 3848. no changes to use, egress or occupancy.
Filing for approval of excavation and foundation
DASNY sprinkler work for elevator upgrade project at City University of New York's North Academic Center.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Sprinkler work on the 10th floor (Ramboll) as indicated on drawings.
9th fl: interior removals as per plans filed herewith. no change to use, egress or occupancy
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Construction work on the 10th floor (Ramboll) as indicated on drawings.
File suspended scaffold outrigger systems for facade restoration and inspection.
Heavy duty sidewalk shed during exterior work. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Overhead protection for occupants at courtyard.
Conversion of dominant occupancy of building from offices to R-2 residential in accordance with the provisions of ZR Article I Chapter 5.
Herewith filing for removal of interior non load bearing partitions and doors as per plans. no change to use, egress or occupancy under this application.
Modification to exisiting sprinkler system,no change to use, egress, or occupancy.