Other Permits in Manhattan, New York
11,314 other permits filed recently
11,314 permits
DASNY sprinkler work for elevator upgrade project at City University of New York's North Academic Center.
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Filing for the following at the polo grounds towers 4, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
9th fl: interior removals as per plans filed herewith. no change to use, egress or occupancy
Temporary standpipe modification to the the cellar as per plans filed herewith. no change in use, egress.
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
Installation of temporary work platform as per plan. no change in use, egress, or occupancy. the work platform on the 17th floor at the southeast corner allows customers to land the suspended scaffold...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Heavy duty sidewalk shed during exterior work. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Modifications to the existing sprinkler system as per plans. No change to use, egress or occupancy.
Installation of temporary suspended scaffold equipment.
Herewith filing sprinkler modifications for NYU Langone HCC- Cath Lab Equipment HCC14 Project. No change in use, egress, or occupancy.
Install of temp platform, LED screen, scenic walls, no alt to exist structures for Paramount Upfront. A TPA is required. Producer is responsible to monitor site safety. All production equipment remove...
Conversion of first and second floors from retail use to eating and drinking Occupancy Croup A-2 and obtaning Certifiacte of Occupancy for same.
File suspended scaffold outrigger systems for facade restoration and inspection.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment re...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.