Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Installation of split systems heat pump and ventilation systems in conjunction with conversion of an existing multi-family residence to a single family residence.
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
General construction work to include addition of a new wheelchair lift device in existing multifamily residential lobby adjacent to existing steps as per plans filed herewith. no change in use, egress...
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Interior demo of partitions on 15th floor as per plans. No change in use, egress or occupancy.
Filing to convert 9th floor of existing office building to residential.
Install new chimney liner and extension as per plans. no change in use, occupancy, or egress.
Mechanical filing as per plans. no change in use, egress or occupancy.
Removal of non-structural partitions for an existing mixed-use building. New non-structural partitions and doors will be installed. There will be no change of use, occupancy or egress under this appli...
New slab opening in B4 level for ductwork.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a temporary enclosure system as per plans. no change in use, egress or occupancy. enclosure system installed in accordance with 2022 nyc building code, chapter 33
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of new sidewalk shed and pipe scaffold with material hoist at 115 east 81st street, manhattan as per plans. there will be no change in the use, egress, or occupancy under this application...
Structural work as shown on plans. No change to use, egress, or occupancy.
RETAIL# 2 - Mechanical work for removal and relocating of piping and ducts
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Replace existing air handling unit and associated ductwork and piping in B4 and B3 levels.
Propose to perform demo work. No change in use, egress or occupancy.