Other Permits in Manhattan, New York
11,365 other permits filed recently
11,365 permits
Remove & provide new lintel and clip angles.
Structural modification on the 17-18 floor as per plans. No change to use egress or occupancy.
Mechanical systems work on the 42nd marketing floor(41st construction floor) as per plans filed. no change to use, egress or occupancy.
Ansonia endoscopy asc reno - mechanical modifications as per plans filed herewith. no change in use, egress, or occupations.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancy
Replace metal chimney.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of industrial rope access for facade inspections.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Modifications to the existing sprinkler system on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Foundation and earthwork related to the construction of a new high rise residential building
Reinforcement of existing 16th Floor construction for floor finish, new interior partition walls, etc.
Mechanical modifications as per plans filed herewith. no change in use, egress or occupancy.
Installation of a temporary chain link construction fence filed in conjunction with M00516712 at NYCHA Building #5 as per plans filed herewith.