Other Permits in Manhattan, New York
11,231 other permits filed recently
11,231 permits
Interior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.
Replace metal chimney.
Application filed for the conversion and enlargement of existing building.
F bldg sp ph3: modification of interior finishes and ceilings to accommodate the sprinkler upgrades within the existing hospital building as per plans. no change to use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Suspended Scaffold for Facade Restoration as shown on plans
General construction and structural work filed to reflect changes of alt i application #122938296 in dob bis.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Temp Construction Fence in conjunction with job M00821048
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural modification on the 17-18 floor as per plans. No change to use egress or occupancy.
Install two split heat pump systems. condenser outside the building and air handlers in kitchen with a coil installed in the existing makeup air unit
Mechanical modifications as per plans filed herewith. no change in use, egress or occupancy.
Installation of industrial rope access for facade inspections.
Installation of scaffold for exterior work at building facades
Installation of heavy duty side walk shed.as per plan.