HVAC Permits in Manhattan, New York
1,069 hvac permits filed recently
1,069 permits
Replace oil burner with gas/oil burner on existing boiler
Boiler replacement filed in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Propose new domestic water service, booster pump and well tank; hot water via boiler and indirect water heater; sanitary and storm system; new gas line for boiler and gas appliances as per plan, in co...
Removal of old air conditioning units and replacement with new unit in kind.
Herewith for the installation of a fuel storage Tank and related piping, in conjunction with the installation of an emergency generator, as part of NB Application 122745100.
Propose new domestic water service, booster pump and well tank; hot water via boiler and indirect water heater; sanitary and storm system; new gas line for boiler and gas appliances as per plan, in co...
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
Removal of old air conditioning units and replacement with new unit in kind.
Herewith for the installation of a fuel storage Tank and related piping, in conjunction with the installation of an emergency generator, as part of NB Application 122745100.
Replace oil burner with gas/oil burner on existing boiler
Installation of one (1) new boiler and dual-fuel industrial combustion burner. no change to use, egress, or occupancy.
Replace boiler.
Plumbing work related to boiler replacement. no change to use, egress, or occupancy.
Installation of one (1) new boiler and dual-fuel industrial combustion burner. no change to use, egress, or occupancy.
Replace boiler.
Plumbing work related to boiler replacement. no change to use, egress, or occupancy.
NYU - Infrastructure Package - INSTALLATION LOCATION OF BOILERS, BOILER CALCULATIONS, SCHEDULES, DETAILS AND CONTROLS.
Replace three ton split air conditioning system.
The scope of work re-using the existing hvac system and re-balance all the existing air terminals for the space. no change in use, egress or occupancy.
New ductwork and other components for existing HVAC system on the 2-3 floors in conjunction with Alt # M01317652 as per plans filed