HVAC Permits in Manhattan, New York
1,062 hvac permits filed recently
1,062 permits
Modifications to the existing HVAC system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Herewith filing mechanical modifications for Boiler Replacement project. No change in use, egress, or occupancy.
Filing herewith for the removal of HVAC ductwork as per plans filed herewith. 14th floor construction/15th floor marketing
Replace three gas fired boilers.
Replacement of water cooled air conditioning unit for the IDF Room on the 5th Floor. No change in use egress and occupancy.
M028, installation of boiler breeching, chimney, steam, condensate & makeup water pipings, submitting on behalf of contractor in conjunction with dob # 103651629. no change in use, egress or occupancy
Hvac replacement for chase bank as per plans submitted herewith. no change in use, occupancy or egress.
Lehman boiler upgrade, mechanical modifications for said scope as per plans. no change in use egress or occupancy.
Cathead placed on 37th floor for hvac modification
Replace three gas fired boilers.
Cathead placed on 37th floor for hvac modification
Hvac replacement for chase bank as per plans submitted herewith. no change in use, occupancy or egress.
Filing herewith for the removal of HVAC ductwork as per plans filed herewith. 14th floor construction/15th floor marketing
Replace boiler and reinstall gas/oil burner.
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Modifications to existing HVAC system equipment and related piping for existing office tenant. No change in use, egress or occupancy.
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes...
Replace oil burner on existing low pressure boiler. change grade of fuel oil from #4 to #2. no change in use, egress, or occupancy is involved under this application.
HVAC removals on the 14th floor as per plans. No change to use, egress or occupancy.
Window replacement, elevator rehab and boiler replacement, localized fisp work, aging in place in localized apartments as per plans filed herewith. no change in use, egress, or occupancy.