Mechanical filing design includes the replacement of an existing 20 ton split air conditioning unit with a new 12 ton split heat pump unit to service the commercial space. No change in use, egress, or...
Hvac modifications for 15th floor commercial space as per plans filed herewith
Mechanical filing design includes the replacement of an existing 20 ton split air conditioning unit with a new 12 ton split heat pump unit to service the commercial space. No change in use, egress, or...
Ps 128m, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to the building. no change in use, egress, or occupancy.
Lehman village boiler upgrades, plumbing modifications as per plans. no change in use egress or occupancy.
Application filed to install new kitchen hood, in the cellar, exhaust fan, make-up air unit in the basement, hvac and ductwork in the mezzanine fl as per plans. fire suppression system filed separatel...
Connect to existing gas piping for replacement boiler and gas burner as per plans. no change in use, egress or occupancy.
Structural work filed for ceiling repairs and boiler room ceiling support as per plans filed. no change in use, egress or occupancy.
Installation of Fuel Storage tanks for a diesel-based emergency generator.
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems throughout the building and all apartments, including heating and cooling units, associated condensers, mechanical e...
Modifications of existing mechanical systems to include hvac installation and associated piping. no change to use, occupancy or egress
Chapel & sacristy - modification of hvac and installation of air handler.
Modification to existing HVAC systems on 10th (14th M) & 11th (15 M) floors. No change in use, egress or occupancy.
Relocation and redistribution of existing HVAC and bathroom exhaust systems as per plans filed herewith. No change in use, egress, or occupancy.
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
Boiler replacement filed in conjunction with renovation of 6-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Record filing for removal of the existing oil burners, boiler, fuel oil tank, and the associated oil tank enclosure, as shown on the drawings filed herewith, and to withdraw DOB application 102700098....
Application filed to replace existing hvac equipment as per plans filed herewith.no change in existing ductwork or air terminals.
mh work on the 11th floor (12th floor marketing) remove existing outdoor condenser & indoor ahus w/ducts. install new hvac. install new indoor units on existing slab. install outdoor condenser on setb...
mh work on the 11th floor (12th floor marketing) remove existing outdoor condenser & indoor ahus w/ducts. install new hvac. install new indoor units on existing slab. install outdoor condenser on setb...