HVAC Permits in Manhattan, New York
1,062 hvac permits filed recently
1,062 permits
Replacement of existing boiler in existing boiler room in cellar in conjunction with restaurant renovation in cellar & first floor.
Modifications to HVAC to accommodate renovations to the Xray suite on partial 5th floor in the existing hospital as per plans filed herewith only.
Installation of new gas boiler in cellar apt 1E as per plans filed herewith. No change in use, egress and occupancy.
Herewith filing for the installation of hvac units @ second floor apartment 2cd.
Replace boiler and oil burner.
Annex Loading Dock: Modification of HVAC ductwork, piping, and equipment to accommodate the LOADING DOCK HEATING AND COOLING alteration in the existing hospital building as per plans filed herewith. N...
Legalization of plumbing fixtures in bathrooms, kitchens, and boiler room, associated with the alteration at the cellar, basement, and 1st floor only. no change to the use, egress, or occupancy.
Annex Loading Dock: Modification of HVAC ductwork, piping, and equipment to accommodate the LOADING DOCK HEATING AND COOLING alteration in the existing hospital building as per plans filed herewith. N...
Legalization of plumbing fixtures in bathrooms, kitchens, and boiler room, associated with the alteration at the cellar, basement, and 1st floor only. no change to the use, egress, or occupancy.
Boiler replacement as a subsequent in conjunction with M00674188- I1 BE to add the 2nd boiler information .NO change in Use,Occupancy or Egress .
Install new gas-fired furnace as per plans. install new dehumidifier and fresh air ductwork to mechanical room. remove existing gas-fired boiler. install new chimney liner in existing masonry chimney...
Minor renovation on 2nd floor for existing office.install new hvac system on 2nd floor .no change in use,egress,occupancy and bulk
Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
Filing to install HVAC system as per plans. No change in use, egress, or occupancy under this application.
The scope of work for this project consist of extending dunnage to accommodate additional HVAC Equipment (filed under DOBNOW applications M01319621, M01319622,M01319603,M01319619). No change in use eg...
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 3rd Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
Herewith file to install new commercial kitchen exhaust system on 1/2 floors, mechanical equipment with associated elements and split-type hvac systems. no change in use, egress, and occupancy
Amiri-modification of ductwork, new distribution, and hvac system re-balancing.
Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
The scope of work for this project consist of extending dunnage to accommodate additional HVAC Equipment (filed under DOBNOW applications M01319621, M01319622,M01319603,M01319619). No change in use eg...