Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Filing for class A apartment unit renovations, interior demolition, general construction, new thru-wall AC masonry openings as per plans filed. No change of use, egress or occupancy.
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #M01299787-I1
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egress, or occupancy
Application to file an Alteration Type One for Base Building Change of Use, Egress and Occupancy per per plans filed herewith. General demolition and construction of covered pedestrian space interior,...
Renovation of existing cellar floor (680sf)& ground floor (1476sf) retail store with minor demolition and construction of new walls, doors & finishes. lighting is existing to remain with only 1 fixtur...
Interior demolition of non-bearing partitions, access stair, and wall and floor finishes SUITE 100. No change of use, egress, or occupancy under this application. See plans for details.
Filing herewith sprinkler and standpipe demolition scope at the garage/parking structure to make way for new theater building/structure as per plans. No change in use, occupancy, or egress under this...
Partial first floor: Minor demolition of partitions & finishes with installation of new walls, office storefronts; remove & replace bathroom walls/ceilings, floors & fixtures. Partial cellar floor: re...
Filing herewith sprinkler and standpipe demolition scope at the garage/parking structure to make way for new theater building/structure as per plans. No change in use, occupancy, or egress under this...
Interior demolition of non-structural partitions and related finishes. removal of 2 ac units. no change of use, egress or occupancy
Renovation the apartment #1c on 1st floor of existing 6 story building. demolition and construction work as per plan. no change in egress, use, or occupancy.
Filing herewith sprinkler and standpipe demolition scope at the garage/parking structure to make way for new theater building/structure as per plans. No change in use, occupancy, or egress under this...
Interior demolition of non-bearing partitions, access stair, and wall and floor finishes SUITE 100. No change of use, egress, or occupancy under this application. See plans for details.
Partial first floor: Minor demolition of partitions & finishes with installation of new walls, office storefronts; remove & replace bathroom walls/ceilings, floors & fixtures. Partial cellar floor: re...
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Demolition Application #M01299787-I1
Renovation of existing cellar floor (680sf)& ground floor (1476sf) retail store with minor demolition and construction of new walls, doors & finishes. lighting is existing to remain with only 1 fixtur...
Interior demolition of non-structural partitions and related finishes. removal of 2 ac units. no change of use, egress or occupancy
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st thru 5th floors (Harry Winston) as per plans. No change to use, egress or occupancy.
Full demolition of 4 story building using mech means to assist
Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.