Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Interior demolition of 2nd and 3rd floor office, interior demolition scope only. no change to use egress or occupancy.
Interior demolition in cellar. No change in use, zoning, or egress.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
General construction interior only demolition and renovation of existing 5 family residential building on floors 001 to 006 and cellar. as per plans filed herewith. no change of use, egress, and occup...
Interior demolition in cellar. No change in use, zoning, or egress.
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress, or occupancy.
General construction interior only demolition and renovation of existing 5 family residential building on floors 001 to 006 and cellar. as per plans filed herewith. no change of use, egress, and occup...
Filing for class A apartment unit renovations, interior demolition, general construction, new thru-wall AC masonry openings as per plans filed. No change of use, egress or occupancy.
Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy
Apartment alteration, minor partition and demolition work. New suspended ceilings and lighting. Renovation of kitchen and bathrooms. No change in use, egress or occupancy under this application.
Renovation of existing cellar floor (680sf)& ground floor (1476sf) retail store with minor demolition and construction of new walls, doors & finishes. lighting is existing to remain with only 1 fixtur...
Minor interior demolition. No change in occupancy or egress.
GENERAL INTERIOR DEMOLITION AND RENOVATION OF AN EXISTING WALK-UP RESIDENTIAL BUILDING FROM 1ST FLOOR THROUGH 5th FLOORS. COMBINATION AT 2nd, 3rd, 4th AND 5th FLOORS AND REDUCTION FROM NINE APARTMENTS...
Filing interior renovation of 26th floor office space as per plans. Interior demolition filed under #M01236904-I1. No change in use, egress, or occupancy under this application.
Interior soft demolition of the existing office as per plans. No change to use, egress or occupancy
GENERAL INTERIOR DEMOLITION AND RENOVATION OF AN EXISTING WALK-UP RESIDENTIAL BUILDING FROM 1ST FLOOR THROUGH 5th FLOORS. COMBINATION AT 2nd, 3rd, 4th AND 5th FLOORS AND REDUCTION FROM NINE APARTMENTS...
Filing interior renovation of 26th floor office space as per plans. Interior demolition filed under #M01236904-I1. No change in use, egress, or occupancy under this application.
Minor interior demolition. No change in occupancy or egress.
Apartment alteration, minor partition and demolition work. New suspended ceilings and lighting. Renovation of kitchen and bathrooms. No change in use, egress or occupancy under this application.