Other Permits in Brooklyn, New York
7,047 other permits filed recently
7,047 permits
Mechanical work associated with conversion of building into daycare facility
Resolve the ecb violation# 39166085l for work without permit: removal for exist'g door, window and installation of new garage door @ cellar level. no change in use, occupany, or egress is involved und...
Construct new 2 story warehouse building as per plans filed
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of new Curb Cut#1 to access building.
Structural work in conjunction with alt co application as per plans,
New partial height interior non-bearing partitions and entry check-in doors on first floor with additional minor scope on other floors related to #321364171. no change in bulk, use, occupancy, or egre...
Sprinkler work as shown on the plans.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.
Sprinkler modifications on 6th floor as shown on plans filed herewith. No change in egress, occupancy, or use.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
The proposed work will manage stormwater runoff on the property through the use of three connected underground storage systems located in the three tennis courts.
Foundation work in conjunction with alt-co for horizontal extension
Structural work filed in conjunction with parking garage filed under 321197432.
File to obtain an equipment usage permit card for the new five (5) split condensing units as indicated on this plan.
Filing for fence in conjunction to alt1 application.
Installation of sub-slab depressurization system. no change in use, egress, or occupancy
Obtain CO for reconfigured two family dwelling. PL,SP,ST,MS under subsequent worktypes.
Propose a new three story with two family house. obtain new c of o