1. install 2 new doors in the 2nd floor as per plan.2. create a new opening in the 2nd floor as per plan.3. remove exist. interior door and close with new wall as per plan.
Provide new fire sprinkler system throughout two-story residential building with basement in conjunction with alt co job # b00916283-i1.
To file sp work type in conjunction with alt-1 application #b00745770.
Installation of construction trailer as per plans filed herewith
Refile existing expired approved plans, show as-built conditions and obtain a new certificate of occupancy
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Removal of sprinkler work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
- Install approximately 35 SF of sidewalk shed at the entrance to the property
Proposed new horizontal enlargement of an existing 4 story building, existing foundation and structure to remain, enlargement to be construction class iii-a and building proposed to be fully sprinkler...
Suspended Scaffold installation and hoist as per plans filed herewith. No change in use, egress and occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Development Hub Job. Initial Consultation Nov 29, 2021 @ 11:30 am. Please submit to Development Hub. Erect a new 30 story mixed-use building.
Installation of temporary sprinkler loop during construction and replacement of existing sprinkler and standpipe system; no change to existing water supply. No change to use, egress, or occupancy.
Installation of refrigerant coolers as shown on plans in conjunction with b01084717-i1.
Installation of supported scaffold for work location access
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
Herewith filing support of excavation
Installation of temporary fence
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams onfloors 1 thru 3 &...
Suspended Scaffold for Facade Restoration as Shown on Plans