HVAC Permits in Brooklyn, New York
737 hvac permits filed recently
737 permits
Filing of hvac systems to obtain certificate of compliances as per plans. no change to use, occupancy or egress.
Ps 045k, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conjunction with dob # 32...
Nycha boiler general construction in the cellar as per plans filed herewith. no change to use, egress, or occupancy.
File construction work to remove partitions and install new boiler room as per plan. no change in use, egress or occupancy.
Support for new generator and ladder access, hvac equipment, and new boiler room. no change in use, egress, or occupancy.
Remove existing HW Heater, Tank and Equipment Pad, Cut/Cap Existing Gas Piping, Remove existing water lines to Boilers Provide new Gas-Fired Hot water heater, Circulation Pump Gas piping, RPA, Blow Do...
Install two new boilers in the cellar.
Install two new boilers in the cellar.
Filing of hvac systems to obtain certificate of compliances as per plans. no change to use, occupancy or egress.
Remove existing HW Heater, Tank and Equipment Pad, Cut/Cap Existing Gas Piping, Remove existing water lines to Boilers Provide new Gas-Fired Hot water heater, Circulation Pump Gas piping, RPA, Blow Do...
Support for new generator and ladder access, hvac equipment, and new boiler room. no change in use, egress, or occupancy.
Installation of new hvac mechanical systems within existing single-family home. no change in use, egress, or occupancy.
The existing parking lot and underground oil tanks will be demolished and removed from the site. The sidewalk in front of the boiler building will be removed and reconstructed to meet ADA requirements...
Nycha boiler- structual work for new building
Installation and removal of piping valving and hangers removal and installation of air handlers ceiling and floor mounted air conditioning units and all associated ductwork. No change in use egress or...
Renovation of existing cellar, first and second floor with plumbing work:relocate kitchen and bathroom fixtures; new boilers and hot water heaters in cellar; no change in use, egress or occupancy unde...
Proposed Mechanical (HVAC, bathroom and kitchen exhaust and FAI)
Mechanical scope for hvac installation of new heating system in building as per plans filed herewith. no change in use, egress, or occupancy.
Replace gas fired boiler.
Nycha boilers- provide split ac unit for ventilation and cooling of engineer's office. provide toilet exhaust fan and relief fan for engineer's office.