HVAC Permits in Brooklyn, New York
743 hvac permits filed recently
743 permits
replace and provide new PTHP's & HVAC equipment as indicated on plans including hallway ventilation system and spot heating equipment as indicated on plans.
Demolish all existing mechanical systems & provide complete new HVAC system for new apartments and all BOH areas throughout the entire renovated building. No change in use, egress or occupancy.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Structural work filed in conjuction with the gc application: coordinate new mep penetrations, dunnage for plaza-supported outdoor boiler pod. no change in use, egress or occupancy.
Interior mechanical demo & modification to existing HVAC units for existing community facility building. No change in use, egress or occupancy.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Register existing boiler per ecb violation # 32067966n installed per laa 310345846
Application file to install a boiler at cellar floor as per plan. no change in use, egress or occupancy under this application.
Install new central air condition system at existing 1-story building.
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Install new central air condition system at existing 1-story building.
Register existing boiler per ecb violation # 32067966n installed per laa 310345846
Subsequent filing plumbing work to install kitchen, bathroom, & boiler room. no change in use, egress, or occupancy.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
NYCHA BOILER - Plumbing work and associated piping for interior renovation.
Renovation of cellar mechanical equipment room - nycha boilers
General renovation of 3-family house with replace/relocated/new plumbing fixtures and boiler and h.w.h as per plan. no change in use, egress or occupancy.
Ex. VRF multi-split heat recovery system to be used for air conditioning dining, service and prep area. Ex. ceiling exhaust fans for restroom to remain. Ex. ERV to be reused for outside air requiremen...
Interior renovation of cellar, 1st & 2nd floor of existing 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceiling and painting throughout....