HVAC Permits in Brooklyn, New York
743 hvac permits filed recently
743 permits
Renovation of existing basement, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters on basement; no change in u...
Abandon existing buried 7,000-gallon fuel oil storage tank. no change in use, egress or occupancy.
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
HVAC work related to renovation of townhouse and change from two family to one. No change to use, egress or occupancy.
Nycha boiler - plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Abandon existing buried 7,000-gallon fuel oil storage tank. no change in use, egress or occupancy.
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
Cap and remove existing boilers and install a new boiler in the boiler room and remedy voilation #039165464r.no change in use, egress,occupancy and bulk
HVAC work related to renovation of townhouse and change from two family to one. No change to use, egress or occupancy.
Renovation of existing basement, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters on basement; no change in u...
Install new split air cooled HVAC units
Installation of plumbing plumbing system for entire building in conjunction with ALT-1 DOB NOW #: B0182730-I1. Filing to replace gas piping from flex piping for apartments, restaurants is filed under...
Replacement of existing boilers. no change to existing use, occupancy or egress is proposed under this application
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
Cap and remove existing boilers and install a new boiler in the boiler room and remedy voilation #039165464r.no change in use, egress,occupancy and bulk
Installation of new boilers as shown on proposed plan as well as all other heating system associated components located in the boiler room. no change to use, egress or occupancy.
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
Replace & install new boiler, new bathroom and plumbing fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.