Demolition Permits in Brooklyn, New York
432 demolition permits filed recently
432 permits
Proposed minor demolition only to remove interior non-load-bearing partitions for existing 4-story 2-family residential building with cellar. no change in use, means of egress or occupancy in this app...
Interior renovation for commercial space with partition and mechanical work. all partition work and demolish work under alteration 1 job#b01238908. install kitchen hood system for proposed eating and...
Partial Demolition of existing 2 story building. Foundation walls and partial exterior walls to remain.
Installation of Wall Ties in conjunction with NYC HPD Emergency Demolition filed at 1355 Fulton Street, FD# B01190517, Dec# 18912
full demolition of two story structure, using hand held equipment.
In order to remove ecb violation #: 35127508r. interior renovation of basement, 1st & 2nd fl. of exist. 2 sty building. demolition & construction work as per plan. partition, flooring, ceiling & paint...
Full Demolition of a 1-story building.
Proposed interior demolition and structural restoration. no change to bulk or egress.
Installation of Wall Ties in conjunction with NYC HPD Emergency Demolition filed at 1355 Fulton Street, FD# B01190517, Dec# 18912
Installation of Wall Ties in conjunction with NYC HPD Emergency Demolition filed at 1355 Fulton Street, FD# B01190517, Dec# 18912
full demolition of two story structure, using hand held equipment.
In order to remove ecb violation #: 35127508r. interior renovation of basement, 1st & 2nd fl. of exist. 2 sty building. demolition & construction work as per plan. partition, flooring, ceiling & paint...
Installation of Wall Ties in conjunction with NYC HPD Emergency Demolition filed at 1355 Fulton Street, FD# B01190517, Dec# 18912
Full Demolition of a 1-story building.
Proposed interior demolition and structural restoration. no change to bulk or egress.
Full Demolition of One Story Building.
Full demolition to a one story building
Renovation of 1st & 2nd floor of existing 2 family residence with a horizontal addition to the 2nd floor at the rear of the house. Partial demolition including removal of non load-bearing interior par...
Filing for interior demolition, rear wall of building opening, new porch, general construction of an apartment unit as per plans filed. No change in use, egress or occupancy.
Removal / demolition of existing site work (pavts, etc) in conjunction with renovated playyard. provide new fencing, pavements, site improvements, fences, and plantings.