Demolition Permits in Brooklyn, New York
432 demolition permits filed recently
432 permits
Full demolition of a 1 high story brick and steel with concrete building.
Full demolition of a 1 high story brick and steel with concrete building.
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # b01208841. no change to use, egress or occupancy under this application.
Interior demolition and installation of new subfloor and non-load-bearing demising wall. Future tenant fit-out under separate permit. Subdivision of existing store. No change to egress, floor area, or...
Full demolition of existing 2 1/2 story house
Propose partial demolition and Structural work for expansion of 2-story building to a 5-story concrete residential building as per plan, in conjunction with GC # B01224916-I1
partial demolition of 2-fam + commercial on conjunction with ALT-CO filing B01093181 - removal of interior partitions, fixtures and finishes; portions of front and rear facades - as per plans
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition, for curing violation # 39548662x
Installation of Wall Ties in conjunction with NYC HPD OP32 Emergency Demolition filed at 1389 East 92 Street, FD# B01358115-I1, DEC# 19966
Partial demolition on existing two-family four-story frame residential building with basment & cellar.no change of building bulk,occupancy or egress.
Convert 3 family apartment building to 2 family house. Demolition in rear yard and rebuild as stepped 2 level addition. Construct 3-level winder stair and new bulkhead for room access. Replace windows...
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
Proposed temporary construction for the demolition of the existing structure and the new construction.
Proposed temporary construction for the demolition of the existing structure and the new construction.
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
Partial demolition on existing two-family four-story frame residential building with basment & cellar.no change of building bulk,occupancy or egress.
Convert 3 family apartment building to 2 family house. Demolition in rear yard and rebuild as stepped 2 level addition. Construct 3-level winder stair and new bulkhead for room access. Replace windows...
Minor demolition of existing partitions. new finishes and cabinets. no change to use, egress or occupancy.
Partial demolition work in coordination with proposed Alt Co as per plans filed.
Full demolition of 2 story w/ cellar masonry building. all as per plans.