Demolition Permits in Brooklyn, New York
432 demolition permits filed recently
432 permits
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors....
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearing walls all floors....
3 story wood frame building to be fully demolished with hand tools only. Mechanical equipment to be used for debris removal, truck loading, and crushed slab on grade.
The proposed demolition is for 2 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the neighboring building...
Interior demolition on existing one (1)- family, two (2) story brick residential building with cellar. work on cellar and 1st floor only. no change in use, means egress or occupancy.
Application is filed for the demolition of wood deck located in the backyard of the property. no change in use, egress or occupancy. all work as per plans submitted herewith.
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
The proposed demolition is for 2 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the neighboring building...
Application is filed for the demolition of wood deck located in the backyard of the property. no change in use, egress or occupancy. all work as per plans submitted herewith.
Interior demolition on existing one (1)- family, two (2) story brick residential building with cellar. work on cellar and 1st floor only. no change in use, means egress or occupancy.
Refiling an old demo application, BIS Job # 301007988, for sign off purposes only. Demolition has been fully completed.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Change in certificate of occupancy 1)converting light manufacturing space to eating and drinking establishment 2)partial demolition of first floor to create new 1 story enlargement in rear yard. 3)new...
Interior renovation existing 2 story building.work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. partition, flooring, ceiling and painting throughout. no change in e...
Full demolition to a one story building
Emergency Work Order - 71 ft high, Chimney Demolition to resolve Complaint #3A42120 in coordination with DOB's Forensic Engineering Unit. Work was completed last month under Forensic Engineering Unit'...
Interior renovation existing 2 story building.work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. partition, flooring, ceiling and painting throughout. no change in e...
Change in certificate of occupancy 1)converting light manufacturing space to eating and drinking establishment 2)partial demolition of first floor to create new 1 story enlargement in rear yard. 3)new...
Refiling an old demo application, BIS Job # 301007988, for sign off purposes only. Demolition has been fully completed.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition