Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Filing herewith plumbing application incunjuction with apt combination. no change in use, egress, or occupancy.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Emergency concrete repairs to the interior of an existing building in the cellar. emergency repair of existingstructural elements column #121, beams and slab at the main entrance of 125 navy walk. the...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of a personnel hoist as per plans in conjunction with nb construction. no change in use, egress or occupancy under this application. hoist installed in accordance with 2022 nyc building c...
Filing herewith plumbing application incunjuction with apt combination. no change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Application filed to show the replaceiwent of lintel at front doors. no change in use, egress and occupancy.
Interior renovation to combine apartment 2g and 2h as per plans filed herewith. related plumbing work filed as subsequent application. no change to use, egress or occupancy.
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting replacement, and ref...
Installation of pipe scaffold at 210 joralemon street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Install new chimney liner. no change to use, occupancy or egress. no change in use, occupancy, or egress.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola