Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
Job filed to show interior renovation to the basemenet and 4th floor and conversion from 10 dwelling units to 7 dwelling units as per plans filed herewith. new certificate of occupancy requested.
Interior renovation to combine apartment 2g and 2h as per plans filed herewith. related plumbing work filed as subsequent application. no change to use, egress or occupancy.
Installation of pipe scaffold at 210 joralemon street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Install new chimney liner. no change to use, occupancy or egress. no change in use, occupancy, or egress.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Filing herewith application for structural worktype, add new stair from basement to second floor. no change in use, egress, or occupancy.
Filing for structural modifications for an apartment renovation as per plans filed. No change of use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Demolition of existing window ac units and toilet exhaust branches and diffusers in boy's and girl's locker room. connect new exhaust with the existing main exhaust. install new heat pump vertical uni...
Renovate Apt 50/5 fl;, Work includes general construction, removal & construction of interior non-load bearing partitions & related finishes; total apt sf is 940, areas of work is 315 sf. Sub Doc file...
Installation of plumbing fixtures for ten new apartments on the 4th. floor.
Plumbing and Sprinkler scope associated with the restaurant renovation on the 002FL (Ground floor) , no change of use, egress or occupancy.
Mechanical modifications as per plans filed herewith.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Mechanical modifications as per plans filed herewith.
Filing for mechanical work as per plans filed. No change in use egress or occupancy.
Filing for structural modifications for an apartment renovation as per plans filed. No change of use, egress or occupancy.
Renovate Apt 50/5 fl;, Work includes general construction, removal & construction of interior non-load bearing partitions & related finishes; total apt sf is 940, areas of work is 315 sf. Sub Doc file...
Filing herewith application for structural worktype, add new stair from basement to second floor. no change in use, egress, or occupancy.