Building Permits in ZIP 11201
Brooklyn, NY — 1,028 permits filed recently
1,028 permits
Installation of suspended scaffold for facade work or inspection.
Plumbing work as shown on the plans.
Remove existing fuel oil storage tanks as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
This Alteration application is being filed in conjunction with Alt CO application #B01101087-I1 for the plumbing work at the subject premises. There are no change in use, egress or occupancy under thi...
Interior demolition and alteration including non load bearing partition, fixtures, and finishes on the basement, 1-3 third floor. all as per plans. no change in use, egress or occupancy.
Plumbing work related to general construction work as per plans filed herewith.
Proposed fitness establishment on the cellar floor. change of use. no change on egress or occupancy. no work proposed.
Modification of plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Modification of plumbing fixtures as per plans filed herewith. no change in use, egress or occupancy.
Interior demolition and alteration including non load bearing partition, fixtures, and finishes on the basement, 1-3 third floor. all as per plans. no change in use, egress or occupancy.
This Alteration application is being filed in conjunction with Alt CO application #B01101087-I1 for the plumbing work at the subject premises. There are no change in use, egress or occupancy under thi...
Plumbing work related to general construction work as per plans filed herewith.
Emergency concrete repairs to the interior of an existing building in the cellar. emergency repair of existingstructural elements column #121, beams and slab at the main entrance of 125 navy walk. the...
Filing herewith plumbing application incunjuction with apt combination. no change in use, egress, or occupancy.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.