Building Permits in ZIP 11101
Queens, NY — 684 permits filed recently
684 permits
THIS IS A FULL DEMOLITION OF 1 STORY FRAME HOUSE. FENCE FILED UNDER SEPARATE APPLICATION. ENTIRE FOUNDATION BELOW GRAD IS TO REMAIN IN PLACE (as per 3303.13.3) AND ADDRESSED IN SOE PLANS OF HERE AFTER...
Drinking fountain replacement
Herewith file subsequent plumbing works. no change in use, egress and occupancy.
Drinking fountain replacement
THIS IS A FULL DEMOLITION OF 1 STORY FRAME HOUSE. FENCE FILED UNDER SEPARATE APPLICATION. ENTIRE FOUNDATION BELOW GRAD IS TO REMAIN IN PLACE (as per 3303.13.3) AND ADDRESSED IN SOE PLANS OF HERE AFTER...
Proposed foundation construction filing in conjunction with alt-co job#q01266280-i1.
Sf/aviation hs - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to dob # q00856543 no change in use, occupancy or egress
Herewith file subsequent plumbing works. no change in use, egress and occupancy.
Plumbing work for an interior renovation for an open market, restaurant, and bistro use group 6.No change in egress, use or occupancy
Plumbing work for an interior renovation for an open market, restaurant, and bistro use group 6.No change in egress, use or occupancy
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior alterations to ground fl unit in an existing building, including new partitions, lighting, and electrical work. alterations to mechanical systems, plumbing, sprinkler under subsequent filings...
Installation of 8'-0 high temporary wood construction fence as indicated on site plan.
Installation of suspended scaffold for facade repair & inspection.
Installation of suspended scaffold for facade repair & inspection.
Interior alterations to ground fl unit in an existing building, including new partitions, lighting, and electrical work. alterations to mechanical systems, plumbing, sprinkler under subsequent filings...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 8'-0 high temporary wood construction fence as indicated on site plan.
Installation of 8ft high Plywood construction fence as per approved plans
Plumbing work filed in conjunction with alt-co renovation with rear horizontal addition. no change in use, occupancy or egress.