Building Permits in ZIP 11432
QUEENS, NY — 142 permits filed recently
142 permits
Filing paa for the revision done in pw-3. no change for drawings and other documents.
Herewith file alteration co to do a horizontal and vertical extension to an existing two story one family dwelling including mechanical work type. fo soe & st filed subsequently, interior reno. and to...
Filing temporary fire alarm/ standpipe in conjunction with nb app q01049852
installation of solar panels, rooftop, railed, grid-tied, 27 modules, 11.745 kw
Disconnect existing rooftop unit from gas supply line, electricpower & duct system. remove existing rooftop units. install packaged gas rooftop units on existing dunnage support. connect new rooftop u...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Exterior facade repairs includes replacement of parapet along exposures 1, 2, 3 & 4. shelf angle replacement as per plans. no change in use, egress or occupancy.
Herewith filing alteration in order to do a horizontal and vertical extension to an exist. 2 story 1 family dwelling.to erect interior partitions,do mechanical work and obtain new c/o. pl and structur...
Subsequent fence application in conjunction with approved gc #
Interior renovation cellar through attic with related plumbing work. Install stand shower and remove bathroom from attic, cap/cut plumbing & sewer line to comply ECB violation#39109840P
HEREWITH FILE ALTERATION CO IN ORDER TO DO WORK IN AN EXISTING ONE FAMILY DWELLING, TO CHANGE A TWO CAR GARAGE INTO A ONE CAR GARAGE AND THE REMAINDER OF THE EXISTING BASEMENT LEVEL TO A HOME OCCUPATI...
Maintain existing temporary loop during construction of the tenant fitout. new full sprinkler system throughout space tied in to existing sprinkler main. new sprinkler system shall consist of new pipe...
Plumbing work for commercial tenant fit-out as shown in plans.
Installation of 10' curb-cut on 168 street. (bet. 90 ave & jamaica ave ; access to loading berth) in conjunction with nb#421133151. no change in use, egress, and occupancy under this application.
Herewith filing for plumbing modifications as per plans.
Installation of pipe scaffoldin, heavy duty sidewalk shed, and plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy und...
Exterior work will be limited to paint. tenant build out for a new fine/fast-casual restaurant with dine-in and take-away services including demolition and general construction work of interior walls...
Hand demolition of fully detached garage.