Building Permits in ZIP 11101
Queens, NY — 684 permits filed recently
684 permits
Installation of industrial rope access for facade and local law inspection
Mechanical modifications taking place on 1st floor as per plans filed herewith. No change in use, egress or occupancy.
Application is filed for an interior renovation of an existing retail space to install a new grease trap, plumbing fixtures, and sprinkler heads to retrofit new tenant layout. no change to use, egress...
Plumbing work as per plans filed herewith.
Sprinkler/standpipe work as per plans filed herewith.
General Construction Modification of 1st floor per plans filed herewith. No change in egress, use, or occupancy.
Interior alterations to sprinkler system in ground fl unit, including new sprinkler branch lines and heads and relocations of existing sprinkler branches/heads, related and subsequent to q01178190-i1
Interior alterations to plumbing in ground fl unit, including new toilet, lav, kitchenette sink, dishwasher, service sink, drinking fountain and associated pipes, related and subsequent to q01178190-i...
Sh/hs555q - for temporary construction equipment(shed) submitting on behalf of contractor, related to dob # q080000859, q00833695 no change in use, occupancy or egress
Plumbing work as per plans filed herewith.
Sh/hs555q - for temporary construction equipment(shed) submitting on behalf of contractor, related to dob # q080000859, q00833695 no change in use, occupancy or egress
Application is filed for an interior renovation of an existing retail space to install a new grease trap, plumbing fixtures, and sprinkler heads to retrofit new tenant layout. no change to use, egress...
Interior alterations to plumbing in ground fl unit, including new toilet, lav, kitchenette sink, dishwasher, service sink, drinking fountain and associated pipes, related and subsequent to q01178190-i...
Interior alterations to sprinkler system in ground fl unit, including new sprinkler branch lines and heads and relocations of existing sprinkler branches/heads, related and subsequent to q01178190-i1
General Construction Modification of 1st floor per plans filed herewith. No change in egress, use, or occupancy.
Mechanical modifications taking place on 1st floor as per plans filed herewith. No change in use, egress or occupancy.
Sprinkler/standpipe work as per plans filed herewith.
Herewith file subsequent plumbing works. no change in use, egress and occupancy.
Proposed foundation construction filing in conjunction with alt-co job#q01266280-i1.
Drinking fountain replacement