Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Mechanical changes as indicated on plans.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Structural modifications taking place on the Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
Modifications taking place on the facade as per plans filed herewith. no change in use, egress, or occupancy.
Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy.
Installation of industrial rope access for facade inspections.
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Suspended Scaffold Installation as per plans filed herewith. No change in egress, use or occupancy.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Structural work as per plans including: support of slab openings for MEP, support of new interior storefront and support of new garage doors.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Suspended Scaffold as shown on plans
Demolition and installation of core restrooms fixtures, installation of new plumbing fixtures in 19th floor interior fit out. Installation of new sprinkler heads and related piping.
Mechanical work as per plans. No change in use, egress or occupancy.
Removal and installation of interior partitions and finishes as per plans. Area of 1st floor increased by 470SF. Floor area relocated from 6th floor (filed under M01006077-I1). No change in use, egres...
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Structural work as per plans
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior renovation of an existing apt12e on 12th floor of an existing residential building. no change in occupancy,use or egress.
Installation of temporary suspended scaffold for facade inspection and repair.