Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
Mechanical changes as indicated on plans.
Installation of industrial rope access for facade inspections.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Structural modifications taking place on the Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy.
Suspended Scaffold Installation as per plans filed herewith. No change in egress, use or occupancy.
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Modifications taking place on the facade as per plans filed herewith. no change in use, egress, or occupancy.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Installation of temporary suspended scaffold for facade inspection and repair.
Removal and installation of interior partitions and finishes at the 6th floor and new elevator openings at 7 & 27th floors. No change in use, egress or occupancy.
Exterior Facade work as per plans. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the 6 & 7 Floors as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (6 & 7 Floors- Tenant Name) as per plans. No change to use, egress or occupancy.
Structural work as per plans including: support of slab openings for MEP, support of new interior storefront and support of new garage doors.
Suspended Scaffold as shown on plans
Demolition and installation of core restrooms fixtures, installation of new plumbing fixtures in 19th floor interior fit out. Installation of new sprinkler heads and related piping.
Structural work as per plans
Mechanical work as per plans. No change in use, egress or occupancy.
Removal and installation of interior partitions and finishes as per plans. Area of 1st floor increased by 470SF. Floor area relocated from 6th floor (filed under M01006077-I1). No change in use, egres...