Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Exterior facade and leak repairs including brick replacement, brick repointing, concrete cover removal, concrete repairs, lintel repairs, and mechanical louver replacement per plans submitted herewith...
Interior non-structural demolition as shown on the plans.
Use of temporary mini crane constructions equipment as per plans filed herewith.
Filing herewith plumbing filing as per plans. no change in use, egress or occupancy.
Hereby to remove fire hose cabinet as shown on plans filed herewith. No change to use, occupancy or egress.
General construction work associated with a floor densification project.
Installation of suspended scaffold for facade work or inspection
Heavy duty sidewalk shed during building converstion filed under application # m01254875. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applica...
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Exterior facade and leak repairs including brick replacement, brick repointing, concrete cover removal, concrete repairs, lintel repairs, and mechanical louver replacement per plans submitted herewith...
Installation of temporary roof protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of non-load bearing partitions as per plans. no change in use, egress or occupancy.
Conversion of dominant occupancy of building from offices to R-2 residential in accordance with the provisions of ZR Article I Chapter 5.
Plumbing fixtures and piping modification as per drawings filed herewith. No change to occupancy, use, or egress.
Filing herewith mechanical filing as per plans. no change in use, egress or occupancy.
Infill of existing stair and elevator openings, framing for new slab infill, mechanical equipment support, new pergola, and reinforcement of roof slab.
Plumbing modifications taking place on the 20th floor as per plans filed herewith. No change in use, egress nor occupancy.
Filing herewith mechanical filing as per plans. no change in use, egress or occupancy.
Infill of existing stair and elevator openings, framing for new slab infill, mechanical equipment support, new pergola, and reinforcement of roof slab.
Plumbing fixtures and piping modification as per drawings filed herewith. No change to occupancy, use, or egress.