Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
Parking garage repairs. no change in use, egress, or occupancy
Plumbing modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress nor occupancy.
Erect illuminated accessory business wall sign for 7th street burger.
Combination of apartments 2103 and 2104 as per plans filed herewith. no change to use, egress or occupancy
Modifications to the Mechanical Systems. Replacing two steam absorption chillers with two variable speed electric chillers. Also, replacement of condenser and chilled water pumps as per plans filed he...
Non-structural partition demolition, removal of plumbing fixtures, flooring. New partitions to create a home office, walk-in closet and relocated kitchen. New flooring, lighting and electrical. No cha...
Mechanical miodification to existing retail space on bas level (luckin coffee). no change to use occupancy or egress.
Modification to existing HVAC system on the 2nd floor (Elevator lobby & corridor) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler systems (Phase 1- Soft Demo) as per plans. No change to use, egress or occupancy.
Installation of outriggers and hoist for facade repair and inspection
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans,
Herewith Filing Modifications to Existing Mechanical Systems in conjunction with interior renovations of existing offices as per plans.
Installation of outriggers for facade repair and inspection
Installation of outriggers and hoist for facade repair and inspection
Installation / modification of plumbing fixtures, installation of new sprinkler heads and related piping for proposed renovation of restaurant in cel, bas, 001-002 as shown on plan set filed herewith....
Filing herewith phased structural construction of 343M to include one-story structure on north side of site and associated below grade basements and foundations
Parking garage repairs. no change in use, egress, or occupancy
9th cycle FISP repairs. No change to use, occupancy or egress.
Herewith filing interior renovations to office space as outlined in plans submitted. No change in use, egress or occupancy is proposed under this application.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans,