Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
Interior alterations to 4th floor commercial space to include non-load bearing demolition. no change to use, occupancy or egress
Mechanical work for building infrastructure upgrades.
Modifications to existing 18th floor plumbing and sprinkler systems. no change to use, occupancy or egress
Mechanical modifications to existing 18th floor commercial space. no change to use, occupancy or egress
Structural work for building infrastructure upgrades
Interior demo and construction for building infrastructure upgrades
Plumbing work as shown on plans filed herewith.
Modification to T-MOBILE site. Install 6 antennas on the facade. Install 5 RRUs, 1 equipment platform, 3 equipment cabinets, 1 PPC and 1 GPS unit on roof.
Office interior renovation at 6th floor. interior renovation including installation of interior non-loading partitions, ceiling tiles, millwork, cabinetry, furniture, and finishes. there is no change...
Filing herewith drawings indicating sprinkler modification to existing systems. No change in use, egress or occupancy.
Pl work filed in conjunction with dob now gc and mh. no change to use, occupancy or egress.
Hereby filing installation of interior millwork on partial 33rd floor and document new place of assembly spaces as per drawings filed herewith.
Removal and installation of new partitions, ceilings, finishes and fixtures as shown on drawings. no change to use, egress or occupancy.
Plumbing work as shown on plans filed herewith.
Removal and installation of new partitions, ceilings, finishes and fixtures as shown on drawings. no change to use, egress or occupancy.
Hereby filing installation of interior millwork on partial 33rd floor and document new place of assembly spaces as per drawings filed herewith.
Pl work filed in conjunction with dob now gc and mh. no change to use, occupancy or egress.
Filing herewith drawings indicating sprinkler modification to existing systems. No change in use, egress or occupancy.
Modification to T-MOBILE site. Install 6 antennas on the facade. Install 5 RRUs, 1 equipment platform, 3 equipment cabinets, 1 PPC and 1 GPS unit on roof.
Reinforcement of existing structural beams on 2nd floor and reinforcement of sub-cellar mechanical room columns . no change in use, egress, or occupancy.