Building Permits in ZIP 10017
Manhattan, NY — 1,026 permits filed recently
1,026 permits
Removal of existing plumbing fixtures and associated piping (Early Demo Package 1) as per plans. No change to use, egress or occupancy.
Plumbing modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Installation of new steel framings below deteriorated slab.
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application...
Filing herewith sprinkler and standpipe installations, additions, and modifications to existing system as per plans.
Reinforce existing interior floor framing and roof terrace framing, design of rear lateral shear walls, and design of new roof dormer. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Structural work as shown.
Loading platform as per plans filed herewith.
Filing herewith sprinkler and standpipe installations, additions, and modifications to existing system as per plans.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Mechanical modifications taking place on the 18th (19th floor marketing) floor as per drawings filed herewith. no change in use, egress or occupancy.
Reinforce existing interior floor framing and roof terrace framing, design of rear lateral shear walls, and design of new roof dormer. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Loading platform as per plans filed herewith.
Modifications to the existing sprinkler system (Early Demo: Package 1) as per plans. No change to use, egress or occupancy.
Filing herewith plumbing installations, additions, and modifications, including but not limited to water piping, RPZs, electric hot water heaters, pumps, fixtures, etc. as per plans.
Mechanical modifications taking place on the 18th (19th floor marketing) floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Filing herewith plumbing work as per plans.
As per hub consultation filed in conjunction with NB #121205604 for Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application...
Filing herewith sprinkler filing as per plans. no change in use, egress or occupancy.