Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
Filing herewith office renovation as per plans.
Removal of interior non load bearing walls as per the plans.
Interior alterations to include non-load bearing demolition. no change to use, occupancy or egress
Renovate/combine existing apartment, partitions, flooring, cabinetry, counters, doors, ceiling, fixtures & finishes. no change in use, egress or occupancy.
Interior alterations to existing 8th floor commercial office space. no change to use, occupancy or egress
Installation of high, medium & low pressure ductwork, dedicatedoutdoor air handling unit, variable volume terminal boxes,diffusers and associated mechanical piping & accessories
Modifications to existing mechanical systems. no change to use, occupancy or egress
Installation and use of temporary sidewalk shed equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Plumbing works for dental office at 8th floor ;no change to use, egress or occupanc
Renovation of apartment #12b. partition work and finishes per plan. no change to egress, use, or occupancy.
Installation of new steel framings below deteriorated slab.
Executive suite: plumbing and sprinkler modifications to accommodate office suite renovation on partial 10th floor in the existing building. no change to use, egress or occupancy.
Propose installation of new plumbing fixtures, sprinkler heads and associated sprinkler branch piping. No change to use, egress or occupancy.
Hereby filing Supplemental support for tenants HVAC equipment for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing Interior non-structural demolition and installation of non-bearing partitions, ceilings and doors for office renovation as shown on plans filed herewith. No change in use, egress, or occ...
Install plumbing fixtures in existing eating and drinking establishment. No change of use, egress, or occupancy under this application
The proposed tenant improvement work is within a fully-demised / fire-rated office tenant space located on the 22nd floor. new interior partitions, ceilings, flooring, millwork and finishes. no change...
Hereby filing Supplemental support for tenants HVAC equipment for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
The proposed tenant improvement work is within a fully-demised / fire-rated office tenant space located on the 22nd floor. new interior partitions, ceilings, flooring, millwork and finishes. no change...
Hereby filing Interior non-structural demolition and installation of non-bearing partitions, ceilings and doors for office renovation as shown on plans filed herewith. No change in use, egress, or occ...