Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
Modification to existing sprinkler system and related piping and installation of temporary sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Mechanical modifications taking place on the 1st floor (lobby) as per plans filed herewith. Scope of work is limited to the removal & installation of ductwork, diffusers, electric heaters, and associa...
Facade overclad as per plans. No change to use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Facade repairs. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Hereby filing to remove and install new plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at madison avenue, east 50th and east 49th street elevations.
Filing for architectural work to create new rooftop amenity space per ZRD 1 appeal #PDA00001445.
Plumbing fixture changes as indicated on plans.
Filing herewith for Anchor point supports and infills on cellar, 1st-4th & Roof.
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Modifications to the existing HVAC system on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Plumbing fixture changes as indicated on plans.
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Filing herewith for Anchor point supports and infills on cellar, 1st-4th & Roof.
Sp work filed on 1st fl in conjunction with dob now gc pl and mh. no change to use, occupancy or egress.