Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Modifications to the existing sprinkler system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Hereby filing to install new plumbing fixtures with related piping on new raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
Mechanical work as per plans filed herewith. No change in use, egress or occupancy under this application.
Hereby filing to install new streel framing for raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Interior demolition of non-load-bearing partitions and furniture; no change to use, egress, occupancy, or bulk.
Modification to the existing sprinkler system on the 2nd floor (Elevator lobby & corridor) as per plans. No change to use, egress or occupancy.
Modification to the existing sprinkler system on the 2nd floor (Elevator lobby & corridor) as per plans. No change to use, egress or occupancy.
Hereby filing to install new plumbing fixtures with related piping on new raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
Mechanical work as per plans filed herewith. No change in use, egress or occupancy under this application.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Hereby filing to install new streel framing for raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
Modifications to the existing HVAC system on the 1st floor (Property Management Office) as per plans. No change to use, egress or occupancy.
Interior demolition of non-load-bearing partitions and furniture; no change to use, egress, occupancy, or bulk.
Installation of non-illuminated sign.