Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
Architectural modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. part of shed will be installed on roadway. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this...
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
Plumbing and sprinkler work related to the interior renovation of existing commercial space on the second floor. no change in use, egress, or occupancy.
Modifications to existing plumbing and sprinkler systems in 26th floor commercial office space. no change to use, occupancy or egress
Modifications to existing plumbing and sprinkler systems in existing 37th and 38th floor office space. no change to use, occupancy or egress
Architectural modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Erection of construction fences at certain locations along first floor commercial storefront. no change to use, egress or occupancy.
Hereby filing to install Three (3) new hose bibs at the roof level for installation of building maintenance unit infrastructure as shown on plans filed herewith. No change to use, occupancy or egress.
Architectural modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing plumbing and sprinkler systems in existing 37th and 38th floor office space. no change to use, occupancy or egress
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on Part of 16th Floor. No Change to Occupancy, Use or Egress is Proposed
Plumbing and sprinkler work related to the interior renovation of existing commercial space on the second floor. no change in use, egress, or occupancy.
Erection of construction fences at certain locations along first floor commercial storefront. no change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Hereby filing to install Three (3) new hose bibs at the roof level for installation of building maintenance unit infrastructure as shown on plans filed herewith. No change to use, occupancy or egress.