Building Permits in ZIP 10017
Manhattan, NY — 1,032 permits filed recently
1,032 permits
Installation of heavy duty sidewalk shed as per plans. part of shed will be installed on roadway. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this...
Hereby filing to remove and relocate sprinkler heads for bathroom renovation with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
Proposed interior renovation for the commercial space within the existing mixed residential and commercial building with minor partition work and new floor finishes. No change in use, egress, or occup...
Replace non-illuminated accessory business aluminum letter sign on the existing main entrance building structure, no change in use, egress, or occupancy.
Sprinkler work taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Removal and replacement of windows and masonry at floors 2 through 40. enlargement of existing exterior openings in non-bearing west exterior wall.
Proposed plumbing work for the commercial space within the existing mixed residential and commercial building. No change in use, egress, or occupancy.
Hereby filing to install (4) new Exterior doors leading to new exterior raised structural steel platform on raised posts as shown on plans filed herewith. No change to use, occupancy or egress.
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
Mechanical modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Architectural modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
FILING PL/SP FOR 8th FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. SPRINKLER HEADS AS PER PLAN.
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
Application filed for plumbing additions/modifications on the 9th floor (suite 904) as per plans filed herewith. no change in use, egress, or occupancy.
General construction modifications taking place on the 20th floor as per plans filed herewith. No change in use, egress nor occupancy.
FILING PL/SP FOR 8th FLOOR INTERIOR RENOVATION, NEW OFFICES, PANTRY, CONFERENCE ROOM, & BATHROOMS AS PER PLAN. SPRINKLER HEADS AS PER PLAN.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Construction modifications taking place on the 7th floor as indicated on the drawings.
Mechanical modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy.