Building Permits in ZIP 10017
Manhattan, NY — 1,025 permits filed recently
1,025 permits
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL Work.) No change to...
Architectural changes as indicated on plans.
Install partitions as per plans.
At 26th floor tenant space, removal of interior partitions and removal/relocation of existing glass doorsas per plans filed herewith. no change to occupancy or means of egress.
Mechanical changes as indicated on plans.
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. No change to use, egress or occupancy.
Interior demo & Architectural changes as indicated on plans.
Mechanical changes as indicated on plans.; including the installation of 4.5 TON Condensing Unit and (3) Split System AC Units.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Supported Scaffold installation as per plans filed herewith.
Mechanical changes as indicated on plans; including changes to existing louver and installation of AC Supplemental Unit.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Installation of industrial rope access for facade inspections.
Interior demo &n reno of non-load bearing partitions, walls, doors, frames, ceiling & finishes as indicated on plans.
At 26th floor tenant space, removal of interior partitions and removal/relocation of existing glass doorsas per plans filed herewith. no change to occupancy or means of egress.
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL Work.) No change to...
Ventilation work, duct distribution as per plans filed herewith. No change to use, egress or occupancy.
Plumbing modifications taking place on the 7th floor as indicated on the drawings.
Interior demo & Architectural changes as indicated on plans.