Building Permits in ZIP 10016
Manhattan, NY — 1,053 permits filed recently
1,053 permits
Herewith filing for interior renovations at the 16th flr infusion center per plans. no change in use, occupancy, or egress under this application.
At first floor, modification to egress and egress door/facade assembly as per ccd1 #pda00004108. alternate egress only approved as temporary egress durng lobby renovation and is to be restored to orig...
The scope of work consists of repairing loose and missing veneer components of the building envelope. No change in use, egress, or occupancy.
Plumbing and sprinkler systems installation as shown on plans filed herewith. no change in use, egress, or occupancy.
Underground plumbing work associated with new building construction
Boiler replacement and associated ducts and piping work as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications for 16th floor commercial space
Installation and use of temporary sidewalk shed as per plans filed herewith. no change to use, egress or occupancy under this application.
NYULH - ambulatory care centre Sprinkler renovation - Sprinkler modifications as shown on plans filed herewith. No change in egress, occupancy, or use.
.herewith filing for modifications to the mechanical system at the 16th flr infusion center as per plans. no change in use, occupancy, or egress under this application.
Herewith filing for interior renovations at the 16th flr infusion center per plans. no change in use, occupancy, or egress under this application.
The scope of work consists of repairing loose and missing veneer components of the building envelope. No change in use, egress, or occupancy.
install (5) new gas equipment and reinstall (6) plumbing fixture reusing existing roughing or in-direct drain line. Remove (1) grease trap.
At first floor, modification to egress and egress door/facade assembly as per ccd1 #pda00004108. alternate egress only approved as temporary egress durng lobby renovation and is to be restored to orig...
Hotel lobby renovation includes demolition of existing non loading bearing partitions. a new hotel lobby office and public restrooms, new finishes will be provided.
Herewith filing sprinkler modifications for HCC Renovations - 12th Floor Refresh Project. No change in use, egress, or occupancy.
Nyu langone medical center - tisch 3 clinical phase 3.1 - modifications to an existing sprinkler sytem as per plans filed herewith. no change in use, egress, or occupancy.
Emergency sidewalk shed to protect public from falling debris. see attachedpe letter.
Application filed for plumbing modifications/additions on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Structural modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy Bridgewater Terrace