Building Permits in ZIP 10016
Manhattan, NY — 1,059 permits filed recently
1,059 permits
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
Hereby filing for the interior renovation of existing apartment #18l on the 18th floor. no change to use occupancy or egress.
At 1st and 2nd floor tenant space, additions/modifications to plumbing system including new fixturesd and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Modify existing plumbing fixtures, add new water/sanitary piping & gas piping with fire suppression shut off valve for new plumbing fixtures, gas-fired HWH and gas cooking equipment for commercial kit...
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work on partial 22nd floor as per plans. No change to use, egress or occupancy.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. NEW MECHANICAL SYSTEM AND DUCTWORKS. NO CHANGE in EGRESS, USE OR OCCUPANCY.
Plumbing work as shown on plans filed herewith.
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WALLS AND FIXTURES PER PLAN. NEW MECHANICAL SYSTEM AND DUCTWORKS. NO CHANGE in EGRESS, USE OR OCCUPANCY.
Modification of mechanical systems as per plans filed herewith. Full Floor fit-out with new ductwork. Existing BMS extended. Loads, perimeter heating system and controls not altered. No change of use,...
Removal & replacement of three (3) 800-ton electric centrifugal water chillers with in kind. install refrigerant exhaust system with leak detection & variable frequency drives on four (4) existg conde...
Proposed structure work for the existing building and add a one-story vertical extension on top of the existing structure, including a mechanical floor and elevator bulkhead. In conjunction with CO jo...
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
At 3rd floor tenant space, additions/modifications to plumbing system including new fixturesd and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
At 3rd floor tenant space, additions/modifications to plumbing system including new fixturesd and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.